• HOMEPAGE
  • UNIVERSITY
  • ACADEMICS
  • OPEN EDUCATION
  • STUDENT AFFAIRS
  • RESEARCH
  • CAMPUS LIFE
  • LIBRARY
  • WEBMAIL
  • DIRECTORY
  • EVENTS
  • ANNOUNCEMENTS
  • ACADEMIC CALENDAR
  • INTERNATIONAL
  • PROSPECTIVE STUDENTS
  • FACULTY & STAFF
  • ALUMNI
  • QUALITY
  • SATIN ALMA
  • KVKK
  • INTERNATIONAL
  • PROSPECTIVE STUDENTS
  • FACULTY & STAFF
  • ALUMNI
  • QUALITY
  • KVKK
Menü
  • TR
  • EN
Anadolu University
  • UNIVERSITY
    Anadolu University
    Rektörlük Önü
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • About Anadolu
    • Administration
    • Internal Audit Unit
    • Office of Secretary General
    • Administrative Units
    • Boards - Commissions
    • Corporate Communications
    • Right to Information
    • Satın Alma
    Eskişehir Academy of Economic and Commercial Sciences, founded in 1958, formed the basis of Anadolu University. The Academy was replaced by Anadolu University in 1982, which has gained a well-deserved place as a modern, dynamic and innovative institution among the largest universities not only in Türkiye, but also in the world.
  • ACADEMICS
  • OPEN EDUCATION
    Anadolu Üniversitesi
    Açıköğretim Sistemi
    Quick Links
    • Anadolum eCampus
    • Second University
    • OESSupport
    • Global Campus
    • Apply Now
    • Student Login
    • Open Education Faculty
    • Türkiye Programs
    • Overseas Programs
    • Admission
    • Academic Calendar
    • Contact Info
    • Local Bureaus for Open Education Sevices in Türkiye
    Anadolu University Open Education Faculty plays an essential role in overcoming educational problems of Türkiye not only by providing open and distance education to 1 million active students and 4 million graduates but also by developing specific projects. Besides with those numbers, the system is among the mega universities of the world. By the constantly renewing method of open and distance education, it implements many initiatives and innovations in the Turkish Higher Education System.
  • STUDENT AFFAIRS
  • RESEARCH
    Araştırma
    Araştırma
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • Units
    • Centers
    • Coordination Offices
    • TÜBİTAK Projects
    • Journals
    • Board of Ethics
    • Scientific Research Projects
    • ARINKOM
    Kısa adıyla BAP (Bilimsel Araştırma Projeleri), yüksek öğretim kurumlarındaki bilimsel araştırmaların desteklenmesi amacıyla geliştirilmiş bir uygulamadır. Bu uygulama YÖK'ün 01.01.2002 tarihinden geçerli olmak üzere yürülüğe aldığı Yükseköğretim Kurumları Bilimsel Araştırma Projeleri Hakkında Yönetmelik uyarınca gerçekleştirilmektedir. Üniversitemizin tüm öğretim elemanları BAP Komisyonuna başvurarak bilimsel araştırmaları için kaynak alabilirler.
  • CAMPUS LIFE
    Anadolu Üniversitesi
    Kampüste Yaşam
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • Social Facilities
    • Culture and Arts Centers
    • Museums
    • Sports Facilities
    • Ensembles
    • Student Clubs
    • Campus Information
    • Photo Gallery
    At Anadolu University, social and cultural activities are as important as education and scientific research. The University frequently holds scientific events such as conferences, seminars, panels, congresses and symposia, and cultural activities such as exhibitions, stage performances and concerts. In addition to smaller conference halls in each unit, Atatürk Culture and Arts Center, Congress Center and Cinema Anadolu on Yunusemre Campus house many activities throughout the year.

PROJECT MANAGEMENT IN INSTRUCTIONAL TECHNOLOGIES

  • Home Page
  • Academics
  • Graduate Schools and Institutes
  • Graduate School
  • Depart. of Computer Education and Instructional Te
  • Master of Arts (MA) Degree
  • Program in Computer Education and Instructional Te
  • Course Structure Diagram with Credits
  • Project Management in Instructional Technologies
  • Course's Contribution to Prog.
Back

Course's Contribution to Prog.

0 : Doesn’t support   1 : Low-level support   2 : Mid-level support   3 : High-level support
No Program Qualifications Level of Contribution
0 1 2 3
1 have literacy skills peculiar to the field of instructional technologies X
2 be aware of the relationship of instructional technologies with other disciplines X
3 develop literacy skills peculiar to the field of instructional technology X
4 integrate information in the field instructional technologies with other disciplines X
5 be aware of the need for lifelong learning X
6 solve problems peculiar to the field by using proper scientific research methods X
7 present their research in scientific settings and share them with other researchers X
8 Produce solutions to problems in the field instructional technologies X
9 play an active role in a specific part of the research process by sharing the task with team mates X
10 have foreign language proficiency at the intermediate level, and seek and use international resources related to the field of instructional technologies X
11 adopt a critical approach to current information and applications in the field of instructional technologies X
12 have high level technology skills for communication and research purposes X
13 design an instructional software or online learning environment through individual or team work X
14 develop and evaluate instructional technologies that meet institutions' educational needs X
15 gather and interpret data related to technology use and integration for academic and professional purposes, and inform the society in the process of being an information society X
16 contribute to interdisciplinary research with the integration of technology into other fields X
17 follow current trends in the field of instructional technology X
  • Description
  • Content
  • Learning Outcomes
  • Learning Activities and Teaching Methods
  • Course's Contribution to Prog.
  • Assessment Methods
Web sitemizdeki çerezleri (cookie) kullanıcı deneyimini artıran teknik özellikleri desteklemek için kullanıyoruz. Detaylı bilgi için tıklayınız.
Google Analytics tarafından yönetilen çerezleri devre dışı bırakabilir veya kabul edebilirsiniz.
Anadolu Üniversitesi
  • ABOUT ANADOLU
  • About Anadolu
  • Office of Secretary General
  • Boards
  • Information and Documents
  • İletişim Bilgileri
  • ACADEMICS
  • Faculties
  • Graduate Schools and Institutes
  • Vocational Schools
  • Schools
  • OPEN EDUCATION
  • ANNOUNCEMENTS
  • Open Education Faculty
  • Türkiye Programs
  • Research
  • Overseas Programs
  • How to Become a Student?
  • Academic Calendar
  • Learning Environments
  • STUDENT AFFAIRS
  • Information and Documents
  • Academic Calendar
  • RESEARCH
  • Units
  • Research Centres
  • Coordination Offices
  • Science and Life
  • CAMPUS LIFE
  • Social Facilities
  • Culture and Arts Centers
  • Museums
  • Sports Facilities
  • Ensembles
  • Student Clubs
  • Campus Services
  • Photo Gallery
Android Application iOS Application
© 2026 Anadolu University - All rights reserved.